All articles

Review and billing

Review a completed shift

What to check on a finished shift, and what marking it ready for billing does.

Review is where a finished shift becomes something you can invoice. Until a shift has been through it, no billing batch can include it — so this is the step that decides what your client is charged for.

Completed shifts collect under Review. Open one and you get the whole shift on a single page: what was scheduled, who was there, what they answered, what went wrong, what materials were used, and what it will cost.

Check the summary

The summary shows what was planned — the scheduled start, the duration, and the order the shift came from.

Two statuses sit on every shift and it is worth keeping them apart:

  • Operational status is what happened: Planned, In progress, Completed, or Cancelled.
  • Billing status is where the money stands: Not billable, Pending review, Ready for billing, Blocked, Exported, or Billed.

A shift arrives in review as Completed and Pending review. Your job is to move the second one.

Check attendance

Attendance lists everyone assigned to the shift with their check-in and check-out times. A missing check-in shows as No check-in recorded rather than as zero hours — the difference matters when you are deciding whether to bill.

For each person you can approve, correct or reject:

  • Approve accepts the times as submitted.
  • Correct replaces them. You enter both a check-in and a check-out time, and the record keeps what was originally submitted alongside your correction, marked (corrected).
  • Reject refuses the record. A note explaining why is required.

Corrections are visible, not silent. Anyone reading the shift later sees both the original and the change, and who made it.

Read the checklist answers

Checklist shows the items for this shift and how many were answered, as answered/total. Anything untouched shows as Not answered.

An unanswered item is not automatically a problem — but it is the cheapest question to ask while the coworker still remembers the visit.

Resolve the deviations

Deviations are the problems the field team reported, with their photos and descriptions. This is the part that actually blocks you: a shift with an open deviation cannot be marked ready for billing.

Reviewing a deviation means classifying it and deciding what happens to it. You set a type — Quality, Access, Damage, Safety or Other — a severity, and one of four outcomes:

Outcome What it does
In review Marks it as under investigation. It stays open, so the shift still can’t be billed.
Resolved Closes it as handled and clears it for billing. Can apply a credit or surcharge.
Dismissed Closes it as needing no action — a false alarm. No billing impact, clears it for billing.
Escalated Flags it for a manager or the client. Stays open and keeps blocking billing.

Two of these clear the shift and two hold it. That is deliberate: an escalated damage report should not quietly become an invoice while somebody is still talking to the client about it.

Review the materials

Materials shows what the visit used of each material. The rows come from two places: materials the order plans for every visit, and materials the field team added on site. Additions come last, marked Added at the visit.

Column What it shows
Planned The quantity the order plans per visit. An addition has no planned quantity.
Used The quantity the field team recorded. Not recorded means nobody changed anything.
Status Pending, Approved or Rejected.

The rule is that the planned quantity stands. Only a quantity you approve changes what the visit bills.

A recorded quantity waits for you, and you have three choices:

  • Correct. Type a different number in the Used field and press Enter. Quantities can have up to two decimals, such as 1.5. If nobody recorded anything on a planned row, you can enter the quantity yourself.
  • Approve. The visit bills the recorded quantity. 0 means none was used, and the line is left off the invoice.
  • Reject. The visit bills the planned quantity instead. Rejecting an addition means it is not billed at all.

Both decisions ask for an optional note, and both are final: an approved or rejected quantity can’t be changed afterwards.

An approved addition becomes its own invoice line for this visit only, priced from the order’s price list. The order itself does not change — the next visit plans the same materials as before. Added materials never earn a RUT deduction.

Planned rows nobody touched block nothing. A recorded quantity that is still pending does: the shift can’t be marked ready for billing until every recorded quantity is approved or rejected.

Adjust the amount

Billing adjustments are one-off changes to what this shift costs. A surcharge adds to the bill; a credit reduces it. Both need an amount and a description saying why it applies.

An adjustment can come from a deviation you resolved, or you can add one directly. Adjustments carry their own approval — Pending, Approved or Rejected — and the panel shows the net adjustment so you can see the combined effect before committing.

Once the shift is exported, adjustments are locked.

Mark it ready for billing

When attendance is settled, deviations are closed, materials are decided and the amount is right, choose Mark ready for billing.

This locks the shift’s billable amount and moves it into billing. It cannot be undone. If the amount is wrong afterwards, the fix is a correction on the invoice side, not a re-review.

If the button refuses, the hint says what is missing. Usually it is an open deviation — Resolve all open deviations first — or a pending material quantity — Approve or reject the recorded materials first.

What happens next

The shift’s billing status becomes Ready for billing, and it appears in Billing as available to put in a batch. From there it is grouped with other ready shifts, confirmed, and exported as draft invoice data.

Still need help?

If you cannot find the answer here, the Rytmia team will help you move forward.

Contact Rytmia